Contractors: You may now view the advertisements, quantities, specifications, and plans for construction projects. The plans can be downloaded to your PC. Contractors will be responsible for costs of duplicating their own plans and can choose photocopying facility of their choice. Addenda will only be faxed to those bidders who attend and have signed in at the pre-bid meeting. It is the responsibility of all bidders to refer to the website for any updates. All referenced times are Central Standard. All meetings will be held at 320 Fountain Circle, Huntsville, AL as referenced, in either the 1st or 2nd floor conference rooms.



******PLEASE NOTE: CONTRACTORS/POTENTIAL BIDDERS ARE AUTHORIZED TO DOWNLOAD EXCEL QUANTITIES (ATTACHMENT "A") OR ANY REVISED EXCEL QUANTITIES FROM THIS WEBSITE AND PASTE TO A 3 1/2" FLOPPY DISK OR CD OF THEIR CHOICE; ONE OR THE OTHER MUST BE SUBMITTED WITH THE ORIGINAL BID PACKET. IN ADDITION, TWO HARD COPIES OF THE BID FORM (ATTACHMENT "A") MUST BE SIGNED AND SUBMITTED WITH BID PACKET *****

Resurfacing of Residential Streets-2012, Phase II, Project No. 65-12-RR02

MANDATORY Pre-Bid Meeting is scheduled for Wednesday, May 23, 2012, at 10:00 a.m. and Bid Opening is scheduled for Thursday, May 31, 2012, at 9:00 a.m.. Both meetings will be held in the 1st Floor Conference Room, Public Services Building, 320 Fountain Circle, Huntsville, AL 35801.

  • Pre-Bid Meeting Attendees

  • Specifications

  • Quantities

  • Advertisement

  • Contact Info: Cynthia Higgins , Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Periodic Bid for Emergency Pipe Bursting, Project No. 65-12-SP26.

    MANDATORY Pre-Bid Meeting is scheduled for Thursday, May 24, 2012, at 9:30 a.m. and Bid Opening is scheduled for Wednesday, June 6, 2012, at 10:00 a.m.. Both meetings will be held in the 1st Floor Conference Room, Public Services Bldg, 320 Fountain Circle, Huntsville, AL 35801.

  • Quantities

  • Specifications

  • Advertisement


  • Contact Info: Shane Cook, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Christopher Drive Left Turn Lane from U. S. Highway 72, Project No. 65-12-TI03".

    Bid Results

  • Revised Quantities-Attachment A1

  • Addendum No. 1

  • Pre-Bid Meeting Attendees

  • Drawings

  • Specifications

  • Advertisement

  • Contact Info: Robbie Stewart, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Thornton Avenue Drainage Improvements, Phase III, Project No. 65-12-DM18

    Bid Results - Apparent low bidder, Miller & Miller, Inc., pending City Council approval on April 26, 2012

  • Addendum No. 1

  • Pre-Bid Meeting Attendees

  • Quantities

  • Drawings

  • Specifications

  • Advertisement


  • Contact Info: Marty Calvert, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Redstone Gateway Package H Monumental Architectural Signage, Project No. 65-12-SP22

    Bid Results- Apparent low bidder, Knight Signs-Pending City Council Approval on May 24, 2012.

  • Addendum No. 3


  • Addendum No. 2


  • Drawing per Addendum No. 1


  • Addendum No. 1


  • Drawings (16MB)


  • Specifications


  • Advertisement


  • Contact Info: Chris McNeese, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Redstone Gateway Extension, Market Street, and Overlook Road Relocation Package 1F-4 Landscaping & Irrigation, Project No. 65-11-SP22

    Bid Results-Apparent low bidder, Vision Landscapes-Pending City Council Approval on May 24, 2012.

  • Addendum No. 5

  • Addendum No. 4

  • Addendum No. 3

  • Addendum No. 2

  • Addendum No. 1

  • Environmental Assessment Report

  • Geotechnical Report

  • All Drawing files (143MB)

  • Individual Drawings parts
    Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9

  • Specifications

  • Advertisement


  • Contact Info: Chris McNeese, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       


    Redstone Gateway Extension, Market Street, and Overlook Road Relocation Package 1F-2 Water Systems and Package 1F-3 Primary Communication and Primary Electrical, Project No. 65-11-SP22

    Bid Results - Package 1F-2 Bid Results-Apparent low bidder, Christopher Professional Enterprises, Inc., pending City Council approval on 4/26/12
    Bid Results - Package 1F-3 Bid Results-Apparent low bidder, Christopher Professional Enterprises, Inc., pending City Council approval on 4/26/12

  • Drawings per Addendum No. 2

  • Addendum No. 2

  • Addendum No. 1

  • Pre-bid Meeting Attendees

  • Environmental Assessment Report

  • Geotechnical Report

  • Specifications

  • All Drawing files (143MB)

  • Individual Drawings parts
    Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9

  • Advertisement


  • Contact Info: Chris McNeese, Project Engineer and
                        Penny Kelly, Engineering Contracts & Procurement Coordinator
                       



    Modified 5/23/2012 (10:35 am)

    DISCLAIMER: It is the responsibility of the Contractor and/or Plans Holder to insure they have the most recent version of the plans. Drawings represent designs prepared for use by the City of Huntsville, Alabama and are not to be copied, reproduced, altered, or used by anyone, or any organization, without the expressed written consent of the City of Huntsville Engineering Division representative authorized to approve their use. Anyone making unauthorized use of these drawings may be prosecuted to the fullest extent of the law.